Diamond Homes Center logo
Display Center

Current Model Homes

Move-In Ready Homes

Under Construction Homes

Floor Plans

Champion Homes

Live Oak Homes

Scotbilt Homes

TownHomes

Map Your Home
Financing
About Us
Contact Us
Display Center

Current Model Homes

Move-In Ready Homes

Under Construction Homes

Floor Plans

Champion Homes

Live Oak Homes

Scotbilt Homes

TownHomes

Map Your Home
Financing
About Us
Contact Us
More
  1. Catalog

Gantt
3 Bed
2 Bath
1,820 Sq. Ft.
32' x 60'
3 Bed
2 Bath
1,820 Sq. Ft.
32' x 60'

Floor Plan

    Gantt floor plan home features

    Property map

    Enter your address or APN/TMS to check if this home fits on your property

    Enter your property street address or APN/TMS

    Gantt

    3 bedrooms

    2 full bathrooms

    1,820 sq. ft.

    32' x 60'

    See brochureDesign home
    Pine Manor standard features

    Construction

    • Energy Star Certified
    • Zone 2 Construction
    • Roof Pitch 3/12
    • 2 x 6 Floor joist 16” OC on 28’ Wide Homes
    • 2 x 8 Floor joist 16” OC on 32’ Wide Homes
    • 5/8” T&G OSB Floor Decking
    • 8’ Sidewalls
    • 2×4 Exterior Walls 16” OC
    • 2×4 Interior Walls
    • F/G Floor Insulation R-22 and Wall R-13
    • Fiberglass Blow-In Roof Insulation R-38
    • R-8 Insulated Overhead Ducts
    • OSB Roof Sheathing
    • Exterior Sidewal Thermowrapp Sheathing
    • OSB Endwalls with Housewrap
    • Double 2 x 4 Marriage Line Walls
    • Knockdown Finish on Flat Ceilings
    Diamond Homes Center logo

    Diamond Homes Center

    Manufactured homes and move-in-ready land-home packages at Diamond Homes Center in East Palatka, FL. Champion, Scotbilt and Live Oak homes.

      Pages

      HomesMapSign upSign in

      Help

      Contact usTerms of ServicePrivacy Policy

      Get started with Diamond Homes Center

      Find, design, and order your next home in a few clicks.

      Sign up


      Gantt

      3 bedrooms

      2 full bathrooms

      1,820 sq. ft.

      32' x 60'

      See brochureDesign home
    • Florida High Winds Strapping
    • Continuous Ventilation System
    • Whole House Shut-Off
      • Energy Star Certified
      • Zone 2 Construction
      • Roof Pitch 3/12
      • 2 x 6 Floor joist 16” OC on 28’ Wide Homes
      • 2 x 8 Floor joist 16” OC on 32’ Wide Homes
      • 5/8” T&G OSB Floor Decking
      • 8’ Sidewalls
      • 2×4 Exterior Walls 16” OC
      • 2×4 Interior Walls
      • F/G Floor Insulation R-22 and Wall R-13
      • Fiberglass Blow-In Roof Insulation R-38
      • R-8 Insulated Overhead Ducts
      • OSB Roof Sheathing
      • Exterior Sidewal Thermowrapp Sheathing
      • OSB Endwalls with Housewrap
      • Double 2 x 4 Marriage Line Walls
      • Knockdown Finish on Flat Ceilings
      • Florida High Winds Strapping
      • Continuous Ventilation System
      • Whole House Shut-Off

      Exterior

      • 6/6 Vinyl Insulated Low-E Windows
      • 36×80 6 Panel Front Door W/Dead Bolt
      • Cottage Rear Door W/Dead Bolt
      • Hardie Fascia – Vinyl Soffit
      • 3 Tab Shingles – W/Ridge Cap Ventilation
      • Vinyl Lap Siding W/Color Matching Corners
      • White Window Lineals- Front Door Side
      • 1 Exterior Hose-Bib
      • 6/6 Vinyl Insulated Low-E Windows
      • 36×80 6 Panel Front Door W/Dead Bolt
      • Cottage Rear Door W/Dead Bolt
      • Hardie Fascia – Vinyl Soffit
      • 3 Tab Shingles – W/Ridge Cap Ventilation
      • Vinyl Lap Siding W/Color Matching Corners
      • White Window Lineals- Front Door Side
      • 1 Exterior Hose-Bib

      Mechanical

      • LED Lighting Package
      • 2 Can Lights in Dining Room
      • 2 Can Lights ni Primary Bedroom – Opt. to wire/brace between cans
      • 1 Exterior GFI Receptacle
      • Strip Lights over Master Bath Lavs
      • 200 Amp Main Panel Box
      • Smoke Detectors Code Specific
      • Plumb &Wire for Washer/Dryer
      • Installed Dryer Vent
      • USB Receptacle in Kitchen
      • Exterior Lantern Light – Each Exterior Door
      • Electric 40 Gallon Water Heater with Pan
      • Programmable Honeywell Thermostat
      • LED Lighting Package
      • 2 Can Lights in Dining Room
      • 2 Can Lights ni Primary Bedroom – Opt. to wire/brace between cans
      • 1 Exterior GFI Receptacle
      • Strip Lights over Master Bath Lavs
      • 200 Amp Main Panel Box
      • Smoke Detectors Code Specific
      • Plumb &Wire for Washer/Dryer
      • Installed Dryer Vent
      • USB Receptacle in Kitchen
      • Exterior Lantern Light – Each Exterior Door
      • Electric 40 Gallon Water Heater with Pan
      • Programmable Honeywell Thermostat

      Interior

      • Lifestyles “Lite” ½” Drywall T/O Orange Peel
      • Glued and Screwed (not nailed)
      • Mohawk Firecreek Carpet
      • Rebond Carpet Pad &Carpet Bar
      • Diamondflor Roled Lnioni al Wet Areas
      • 2 Panel Square Interior Doors
      • Round Doorknoks Instaled T/0
      • Floor Mounted Coorstops
      • 3” Crown &Base Trim Instaled CA/ & MBR
      • 2 1/4” Window and Door Trim CA/ & MBR
      • 3” Flat Trim & 1 1/2” Window & Door Trim in Non-C/A
      • Décor Valance Package
      • 2” Mini Blinds Instaled
      • 6” Plus Door and Drawer
      • Lifestyles “Lite” ½” Drywall T/O Orange Peel
      • Glued and Screwed (not nailed)
      • Mohawk Firecreek Carpet
      • Rebond Carpet Pad &Carpet Bar
      • Diamondflor Roled Lnioni al Wet Areas
      • 2 Panel Square Interior Doors
      • Round Doorknoks Instaled T/0
      • Floor Mounted Coorstops
      • 3” Crown &Base Trim Instaled CA/ & MBR
      • 2 1/4” Window and Door Trim CA/ & MBR
      • 3” Flat Trim & 1 1/2” Window & Door Trim in Non-C/A
      • Décor Valance Package
      • 2” Mini Blinds Instaled
      • 6” Plus Door and Drawer

      Kitchen

      • Whirlpool 18’ FF Refrigerator
      • Whirlpool 30” Deluxe Electric Range
      • Stainless Appliances
      • Mission Cabinet Doors W/Round Knobs
      • Mar Resistant Rolled Edge Laminate Countertops
      • 1 Row Ceramic Tile Backsplash
      • Shelf over Refer
      • Vinyl Lined Bank of Drawers
      • 3⁄4” Vinyl Lined Base & O/H’s Cabinets T/O
      • Full Extension Drawer Guides
      • Metal Single Lever Faucet with Sprayer
      • Stainless Steel Sink
      • 40” Overhead Cabinets
      • Whirlpool 18’ FF Refrigerator
      • Whirlpool 30” Deluxe Electric Range
      • Stainless Appliances
      • Mission Cabinet Doors W/Round Knobs
      • Mar Resistant Rolled Edge Laminate Countertops
      • 1 Row Ceramic Tile Backsplash
      • Shelf over Refer
      • Vinyl Lined Bank of Drawers
      • 3⁄4” Vinyl Lined Base & O/H’s Cabinets T/O
      • Full Extension Drawer Guides
      • Metal Single Lever Faucet with Sprayer
      • Stainless Steel Sink
      • 40” Overhead Cabinets

      Bathroom

      • Mission Cabinet Doors W/Round Knobs
      • Mar Resistant Reled Edge Laminate Countertops
      • 1 Row Ceramic Tile Backsplash
      • Vanities Built to 36” Height – Al Baths
      • Metal Faucets ni Sinks, Tubs &Showers
      • Elongated Water Saver Commodes
      • China Lavs with 24”x 36” Mirror Above
      • Exhaust Fans Installed in Al Baths
      • 1 Piece Fiberglass Tub/Shower in Hall Bath
      • Master Showers Fiber Glass model Specific
      • Radiance Stand Alone Tub ni Master Bath
      • Mission Cabinet Doors W/Round Knobs
      • Mar Resistant Reled Edge Laminate Countertops
      • 1 Row Ceramic Tile Backsplash
      • Vanities Built to 36” Height – Al Baths
      • Metal Faucets ni Sinks, Tubs &Showers
      • Elongated Water Saver Commodes
      • China Lavs with 24”x 36” Mirror Above
      • Exhaust Fans Installed in Al Baths
      • 1 Piece Fiberglass Tub/Shower in Hall Bath
      • Master Showers Fiber Glass model Specific
      • Radiance Stand Alone Tub ni Master Bath

      Other

      • Merit 1 (Year 1) Warranty
      • Merit 7 (Year 2 – 7) Warranty
      • Merit 10 (Year 2-10) Warranty
      • Merit 1 (Year 1) Warranty
      • Merit 7 (Year 2 – 7) Warranty
      • Merit 10 (Year 2-10) Warranty

      Dealer License #:

      Powered by BuildTrove.com
    • Pine Manor
    • Gantt
    • View similar homes

      Osborne floor plan home features

      Osborne

      3 Bed | 2 Bath | 1,820 Sq. Ft. | 30' 4" x 60'

      View detailsDesign home

      Lake Manor 3260H32P03

      3 Bed | 2 Bath | 1,820 Sq. Ft. | 30' 4" x 60'

      View detailsDesign home

      Lyeffion

      3 Bed | 2 Bath | 1,689 Sq. Ft. | 32' x 56'

      View detailsDesign home

      Palston

      3 Bed | 2 Bath | 1,600 Sq. Ft. | 26' 8" x 60'

      View detailsDesign home